reconstruction house 3 and new construction cafeteria in the "Küchwald" hospital in Chemnitz

Architecture
  • Connecting building - exterior view
    Connecting building - exterior view
  • Connecting building - exterior view
    Connecting building - exterior view
  • Connecting building - foyer
    Connecting building - foyer
  • Connecting building - waiting area
    Connecting building - waiting area
Client
Klinikum Chemnitz gGmbH
Construction costs
5.950.000 EUR
Planning period
2005 - 2010
Description

Reconstruction house 3 with construction of a cafeteria and aconnecting building between houses 2 and 3

  • engineering design, landscaping, structural engineering, water-, wastewater engineering, HVAC, electrical engineering (incl. elevator)
  • HOAI - Phases 1 - 8